4D 5D Modeling
BIM BOSS Team provides 4D/5D modeling services. 4D incorporates the time factor by linking the construction schedule to the building information model. Using graphical representation to understand time-based manners can help to foresee conflicts and study alternative options. The fifth dimension (5D) is cost a 5D estimate provides a construction cost estimate through material quantities that are automatically generated from the data within the model. 4D/5D modeling is a great solution for complex site logistics, installation phasing visualization, and cost estimating.