NEON DATA CENTRE : FROM BIM COORDINATION TO AS – BUILT MODEL DELIVERY
November 6, 2026

BIM COORDINATION & AS-BUILT MODEL DELIVERY


Project – NEON Data Centre
Building Type – Data Centre
Building Configuration – 4 Storey
Approximate Built Area – 76,000 sq ft
BIM Scope – BIM Modelling, multidisciplinary Coordination, Construction Updates, QA/QC, As-Built Model and Handover
Delivery Approach – End-to-End Digital BIM Workflow

PROJECT OVERVIEW

3D VIEW (3)

The NEON Data Centre was delivered through an end-to-end BIM workflow covering BIM modelling, multidisciplinary coordination, construction-stage updates, QA/QC and final as-built model delivery.

The BIM model was maintained as a live project information source throughout the project, allowing design and approved construction changes to be incorporated into the coordinated model and final as-built record.

PROJECT CHALLENGE

The project required coordination of multiple disciplines within a complex data-centre environment while maintaining accurate project information through construction.

Key requirements included:

  • Multidisciplinary model coordination
  • Identification of spatial and service conflicts
  • Coordination of access and maintenance requirements
  • Management of design and site changes
  • Maintaining model accuracy through construction
  • Production of a reliable as-built BIM model

SCOPE OF BIM

MNR ROOM 3D VIEW

01. Architecture

Building geometry

Levels and spaces

Openings and doors

Finishes and architectural components

02. Structure

Structural elements

Grids and levels

Framing and slabs

Architectural and MEP interfaces

03. MEP / SERVICES

Major plant and equipment

Duct work and pipework

Distribution routes

Containment

Service interfaces

04. BIM INFORMATION

Model organization

Naming conventions

Parameters

Element information

Coordinated discipline models

COORDINATION & CLASH MANAGEMENT

HPG-PATCH VIEW

A federated multidisciplinary model was used to review and resolve coordination issues.

BIM Coordination Process

The coordination review covered:

  • Spatial / geometric conflicts
  • Access and maintenance clearances
  • Vertical service coordination
  • Openings and penetrations
  • Design and construction changes

Each identified issue was reviewed, resolved and incorporated into the relevant model before rechecking the affected area.

CONSTRUCTION-STAGE BIM

The BIM model continued to be updated as the project progressed.

Latest Design

Construction / Site Information

Model Update

QA/QC

As-Built Model

QA / QC PROCESS

Before final issue, the model was reviewed for:

QA_QC Checklist

AS-BUILT MODEL DELIVERY

OBC RACK
The final as-built model was developed through a continuous update process rather than as a separate late-stage modelling exercise.

FINAL CONSTRUCTION INFORMATION

  • APPROVED CHANGES
  • MODEL UPDATE
  • QA/QC
  • FINAL AS-BUILT MODEL

This approach helped maintain continuity between the coordinated model and the final project record.

PROJECT OUTCOME

A CONNECTED DIGITAL WORKFLOW FROM DESIGN TO HANDOVER

01. END-TO-END BIM Delivery

A single connected workflow was maintained from project commencement through final as-built delivery.

02. MULTIDISCIPLINARY COORDINATION

Architecture, structure and building-services information could be reviewed within a common digital environment. This supported the identification and resolution of interdisciplinary interfaces.

This supported the identification and resolution of interdisciplinary interfaces.

03. CONTROLLED ISSUE RESOLUTION

Coordination issues were:

Identified

Recorded

Reviewed

Resolved

Incorporated into the model

Rechecked

04. LIVE MODEL UPDATES

Approved project changes could be incorporated into the live BIM information rather than remaining disconnected from the model.

05. AS-BUILT DIGITAL RECORD

The completed project was represented through an updated as-built BIM model prepared for handover and future reference.

06. FUTURE INFORMATION VALUE

The structured BIM model can provide an information base for potential future:

Maintenance activities

Refurbishment

Modifications

Asset-related activities

Project reference

KEY TAKEAWAY

The NEON Data Centre demonstrates how maintaining one connected BIM workflow from modelling through coordination, construction updates, QA/QC and as-built delivery can provide a consistent digital project record from start to handover.

NEED RELIABLE BIM COORDINATION & AS-BUILT DELIVERY?

Keep your project information connected from design to construction and handover with BIMBOSS CONSULTANTS

From multidisciplinary coordination and clash detection to construction updates, QA/QC and As-Built BIM delivery, our team helps you maintain a reliable digital project record.

From Model to Construction-Ready Documentation — BIMBOSS CONSULTANTS Connects the Workflow.

Explore Our Services

Explore More Case Studies



→ From Model to Shop Drawing: Nashville Project



→ FSHU PROJECT CASE STUDY



→ Granville – End-to-End Plumbing BIM Modeling & As-Shop Drawing Development

Share it on Social Media