PROJECT OVERVIEW

3D VIEW

Clarendale West End was delivered through an end-to-end BIM workflow covering Electrical and Plumbing modelling, multidisciplinary coordination, clash resolution, shop drawing development, and final QA/QC.

The objective was to create reliable, coordinated service information that could transition efficiently from the BIM environment into construction-ready documentation.

Rather than treating modelling and shop drawings as separate processes, the project followed a connected workflow where the coordinated BIM model served as the foundation for documentation.

PROJECT OBJECTIVE

The primary objective was to develop accurate, coordinated and construction-ready Electrical and Plumbing information while maintaining consistency between the BIM model and issued shop drawings.

The workflow focused on:

  • Accurate service modelling
  • Multidisciplinary coordination
  • Early clash identification
  • Model-level issue resolution
  • Consistent shop drawing production
  • Structured QA/QC before final issue

BIM DELIVERY APPROACH

SCOPE OF SERVICES

Our scope covered the complete BIM-to-documentation process:

From Revit modelling and Navisworks coordination to clash resolution, documentation and final QA/QC, the project was managed as one connected delivery process—helping maintain coordination, consistency and construction-focused documentation throughout the workflow.

Our scope covered the complete BIM-to-documentation process:

  • Electrical & Plumbing BIM Modelling and Service Layout Development.
  • Revit-based model development
  • Multidisciplinary coordination using Navisworks
  • Clash identification and resolution
  • Coordination comment incorporation
  • Coordinated shop drawing production
  • Model and drawing QA/QC

END-TO-END WORKFLOW

BIM STRATEGY

The project followed a single coordinated source of information approach.

Electrical and Plumbing elements were developed in Revit, reviewed within the wider project environment, coordinated through Navisworks, and then translated into construction-focused shop drawings.

This helped maintain a clear connection between the model, coordination process and final documentation.

BIM MODELLING & COORDINATION

REVIT BIM MODELLING

ELE FLOOR PLAN

Autodesk Revit was used as the primary BIM authoring platform for developing the Electrical and Plumbing services.

The models were progressively refined based on project information, design intent and coordination requirements, with attention to:

  • Service routing
  • Equipment and connections
  • Levels and spatial requirements
  • Discipline interfaces
  • Construction documentation requirements

ELECTRICAL BIM MODELLING

CASE STUDY ELE IMG1

The Electrical modelling workflow focused on:

  • electrical service layouts
  • Coordinating routes with architectural and structural constraints
  • Reviewing equipment locations and service clearances
  • Refining model views for construction documentation

PLUMBING BIM MODELING

FLOOR PLAN

The Plumbing modelling workflow included:

  • Developing pipework and system layouts
  • Coordinating pipe routes and levels
  • Reviewing connection requirements
  • Coordinating service zones with other disciplines
  • Refining the model to support shop drawing production

NAVISWORKS COORDINATION

Autodesk Navisworks supported the multidisciplinary coordination and clash review process.

Relevant discipline models were federated and reviewed to identify spatial conflicts, routing issues and Constructability concerns before final documentation.

COORDINATION WORKFLOW

Clashes were reviewed based on their location, service hierarchy and potential construction impact. Where required, routing or level adjustments were incorporated directly into the Revit model before the coordinated area was rechecked.

FROM BIM MODEL TO SHOP DRAWINGS

Once the Electrical and Plumbing models were coordinated, the Revit environment became the foundation for shop drawing development.

This model-led approach reduced duplication between modelling and documentation while helping maintain consistency between the coordinated model and construction drawings.

SHOP DRAWINGS DEVELOPMENT

UNIT PLANS

The process included:

  • Setting up plans, sections and enlarged views
  • Applying dimensions, levels, tags and service identification
  • Reviewing scale, view range and visibility
  • Clearly representing coordinated service routes
  • Reviewing interfaces, penetrations and spatial requirements
  • Incorporating coordination and design changes
  • Completing drawing checks before issue

DOCUMENTATION QA/QC

Before final issue, the deliverable were reviewed for:

  • Model-to-drawing consistency
  • Dimension and annotation accuracy
  • Drawing scale and visibility
  • Detail and reference completeness
  • Revision alignment
  • Coordination status

Changes identified during coordination or review were incorporated into the model and corresponding drawing views before issue.

PROJECT OUTCOMES

ISOMETRIC VIEW

The Clarendale West End project demonstrates how a connected BIM workflow can take Electrical and Plumbing services from modelling through coordination and into coordinated shop drawing production.

KEY OUTCOMES

01. Connected BIM Workflow

A continuous process from modelling to construction documentation.

02. Better Coordination Visibility

Improved understanding of service interfaces and spatial constraints.

03. Early Issue Resolution

Coordination issues were identified and addressed before final documentation.

04. Model-to-Drawing Consistency

Shop drawings were developed from the coordinated BIM environment.

05. Structured QA/QC

Models and drawings underwent defined review processes before issue.

06. Reusable BIM Information

The coordinated model supported both multidisciplinary coordination and documentation production.

KEY PROJECT DELIVERABLES

Electrical BIM Deliverables

PROJECT WORKFLOW AT A GLANCE

The project demonstrates how BIM can function as more than a modelling platform—serving as the controlled information base connecting coordination, documentation and construction delivery.

CONCLUSION

Clarendale West End demonstrates our capability to deliver Electrical and Plumbing services through a structured BIM-to-shop-drawing workflow.

From Revit modelling and Navisworks coordination to clash resolution, documentation and final QA/QC, the project was managed as one connected delivery process—helping maintain coordination, consistency and construction-focused documentation throughout the workflow.

Streamline Your BIM-to-Shop Drawing Workflow

Improve coordination, resolve clashes early, and maintain model-to-drawing consistency with BIMBOSS CONSULTANTS

From Model to Construction-Ready Documentation — BIMBOSS CONSULTANTS Connects the Workflow.

Explore Our Services

Explore More Case Studies



→ From Model to Shop Drawing: Nashville Project



→ FSHU PROJECT CASE STUDY



→ Granville – End-to-End Plumbing BIM Modeling & As-Shop Drawing Development

Share it on Social Media