FSHU PROJECT CASE STUDY
October 22, 2026

FROM BIM MODELING TO CONSTRUCTION – READY AS – SHOP DRAWINGS


Project – FSHU Project
Scope – Mechanical • Plumbing • Electrical
BIM Software – Autodesk Revit • Navisworks
Project Delivery – Start-to-End BIM Modeling and As-Shop Drawing
Key Deliverable – Coordinated BIM Model and As-Shop Drawing Package

PROJECT OVERVIEW

Isometric view of bulding - 02

The FSHU project involved an end-to-end BIM delivery process, connecting multidisciplinary modeling, coordination, clash resolution, and construction documentation.

Our team developed coordinated Mechanical, Electrical and Plumbing, (MEP) models, ensuring consistency between the digital building model and the final as-shop drawing package.

From initial modeling to final documentation, each stage followed a structured workflow to maintain model accuracy, resolve coordination issues, and deliver reliable construction-ready information.

PROJECT OBJECTIVES

Coordinated BIM Modeling & Documentation:

  • Plumbing BIM modelling in Autodesk Revit
  • Development and coordination of plumbing service routes
  • Pipe routing and elevation coordination
  • Identification and resolution of spatial conflicts
  • Coordination with architectural and structural elements
  • Sleeve placement based on coordinated pipework
  • Clash detection and coordination using Autodesk Navisworks
  • Preparation of plumbing and sleeve shop drawings
  • Model-to-drawing QA/QC
  • Final coordinated documentation for project delivery

PROJECT SCOPE

plumbing floor plan

01. Mechanical

Equipment placement, ductwork routing, service coordination, plans, sections, and details.

02. Plumbing

Pipework, equipment connections, routing coordination, plans, sections, and as-shop documentation.

03. Electrical

Electrical services, equipment layouts, routing coordination, and coordinated drawing documentation.

SOFTWARE & TECHNOLOGY

01. Autodesk Revit

BIM modeling, model development, documentation, and drawing production.

02. Autodesk Navisworks

Multidisciplinary coordination, clash detection, and issue review.

BIM MODELING & COORDINATION WORKFLOW

CASE STUDY ISOMETRIC IMG1

The project followed a structured BIM workflow that connected model development with coordination reviews and final drawing production. Each stage supported the accuracy, consistency, and completeness of the final deliverable.

END-TO-END DELIVERY PROCESS

01. Model Setup

Reviewed the available project information, established the modeling environment, and prepared discipline-specific Revit models.

02. BIM Modeling

Developed Mechanical, Plumbing, and Electrical services in Revit based on the available design information and project requirements.

03. Multidisciplinary Coordination

Reviewed combined discipline models to assess service interfaces, routing, elevations, access requirements, and congested areas.

04. Clash Detection

Used Navisworks to identify hard clashes, clearance conflicts, and potential coordination issues between building services and other elements.

05. Issue Resolution

Reviewed coordination findings, adjusted service routing and elevations where required, and updated the relevant Revit models.

06. Model QA/QC

Checked model consistency, coordination updates, views, annotations, and documentation readiness before final drawing production.

07. As-Shop Drawing Production

Generated and reviewed drawing sheets from the coordinated models, incorporating the required dimensions, tags, notes, references, and details.

KEY COORDINATION FOCUS AREAS

Ensuring clash-free MEP coordination and accurate installation:

  • Interdisciplinary coordination between Mechanical, Plumbing, and Electrical services.
  • Service routing within restricted ceiling spaces and vertical shafts.
  • Pipe and duct elevations, accessibility, and maintenance clearances.
  • Interfaces and penetrations involving architectural and structural elements.
  • Model-to-drawing consistency following coordination updates.

KEY CHALLENGES & SOLUTIONS

Client comment

01. Multidisciplinary Service Congestion

Challenge: Multiple building services competing for limited space in ceiling zones, shafts, and service areas.

Solution: Reviewed combined services in Navisworks and refined routing, elevations, and spatial allocation to improve coordination.

02. Clashes Between Building Services

Challenge: Potential conflicts between Mechanical, Plumbing, Electrical, and other building elements.

Solution: Identified coordination issues, reviewed their impact, prioritized critical conflicts, and updated the relevant Revit models.

03. Changes During Project Development

Challenge: Design revisions and coordination comments requiring updates across model elements and documentation.

Solution: Incorporated required changes into the models and carried the updates through to the affected views and drawings.

04. Model-to-Drawing Consistency

Challenge: Maintaining consistent information between the coordinated BIM models and the final drawing package.

Solution: Used the coordinated Revit models as the primary documentation reference and conducted drawing QA/QC before issue.

05. As-Shop Drawing Accuracy

Challenge: Ensuring drawing sheets contained clear, complete, and consistent technical information.

Solution: Reviewed plans, sections, dimensions, annotations, tags, references, visibility settings, and revisions against the latest coordinated information.

QUALITY ASSURANCE & DOCUMENTATION

sanitary floor plan

Quality control was incorporated into the workflow to support reliable model information and clear drawing deliverable.

Key QA/QC checks included:

  • Verifying drawing content against the latest coordinated model.
  • Reviewing dimensions, annotations, and technical information for clarity.
  • Checking drawing scales, crop regions, and view visibility settings.
  • Verifying details, tags, references, and sheet completeness.
  • Aligning revisions with the latest available project information.
  • Reviewing final PDF, CAD files, or other agreed deliverable before issue.

This structured review process helped maintain consistency between model development, coordination updates, and the final documentation package.

VALUE DELIVERED

The integrated BIM-to-documentation workflow supported the following project outcomes:

Coordinated MEP Models:

Developed multidisciplinary BIM models covering Mechanical, Plumbing, and Electrical services.

Improved Coordination Visibility:

Identified potential conflicts and service interface issues during coordination reviews.

Consistent Documentation:

Maintained alignment between coordinated model information and drawing production.

Construction-Ready Information:

Prepared clear as-shop drawings for downstream project use.

End-to-End Delivery:

Connected BIM modeling, coordination, issue resolution, QA/QC, and drawing delivery within one structured workflow.

PROJECT OUTCOME

The FSHU project demonstrates an integrated approach to BIM modeling, multidisciplinary coordination, and as-shop drawing delivery.

By combining Revit-based model development with Navisworks coordination reviews, the workflow supported the identification of coordination risks, resolution of service interfaces, and alignment of model information with the final drawing package.

KEY TAKEAWAYS

Key QA/QC checks included:

  • End-to-end involvement from BIM modeling to as-shop drawing delivery.
  • Multidisciplinary coordination across Mechanical, Plumbing, and Electrical services.
  • Revit-based modeling and documentation.
  • Navisworks-supported clash detection and coordination review.
  • Structured QA/QC before final drawing issue.

Your Next Project Deserves More Than a BIM Model.

From coordinated MEP systems to construction-ready as-shop drawings, we help turn digital models into actionable project deliverable.

Let’s bring your next project from model to reality.

Connect with BIMBOSS CONSULTANTS to discuss your project.

From Model to Construction-Ready Documentation — BIMBOSS CONSULTANTS Connects the Workflow.

Explore Our Services

Explore More Case Studies



→ FROM BIM MODEL TO CONSTRUCTION DRAWINGS: CLARENDALE WEST END



→ FROM MODEL TO SHOP DRAWING: NASHVILLE PROJECT



→ GRANVILLE: FROM BIM MODEL TO CONSTRUCTION – READY DRAWINGS