CLUB MED : FROM COORDINATED MODELS TO FABRICATION – READY DRAWINGS
October 28, 2026

CLUB MED | MECHANICAL FABRICATION BIM


Project – Club Med
Discipline – Mechanical
Scope of Services – Fabrication Modelling, Coordination & Documentation
Software Used – Autodesk Revit, Navisworks
Final Deliverables – Coordinated Mechanical Model & As-Shop/Fabrication Drawings

PROJECT OVERVIEW

3D View - 01

The Club Med project involved developing a coordinated mechanical fabrication model and preparing fabrication-ready documentation through a structured BIM workflow. The scope covered mechanical modelling, fabrication detailing, multidisciplinary coordination, clash review, issue resolution and final as-shop drawing production.

The work focused on translating the available project information into detailed mechanical geometry and coordinated documentation suitable for fabrication and installation planning.

PROJECT REQUIREMENTS

The project required a detailed mechanical model that accurately represented system routing, fittings, connections, elevations and installation-related information. The model also needed to be reviewed against surrounding building elements and services before fabrication drawings were finalized.

The primary requirements were:

  • Develop fabrication-level mechanical models in Autodesk Revit.
  • Coordinate mechanical services with surrounding structures and adjacent building systems.
  • Identify and resolve clashes and spatial constraints using Navisworks.
  • Prepare as-shop/fabrication drawings from the coordinated model.
  • Verify model accuracy, drawing completeness and revision consistency before deliverable issue.

SCOPE OF SERVICES DELIVERED

callage club med

01 — Mechanical Fabrication Modelling

Developed mechanical systems with detailed routing, fittings, offsets, connections, dimensions and elevations.

02 — BIM Coordination

Reviewed the mechanical model alongside relevant building elements and services to identify spatial conflicts and routing constraints.

03 — Clash Detection and Resolution

Used Navisworks for coordination reviews, refined the affected model elements in Revit, and rechecked updated conditions.

04 — As-Shop Drawing Production

Prepared fabrication drawings with relevant dimensions, annotations, tags, references and installation information.

05 — QA/QC and Documentation

Reviewed model-to-drawing consistency, dimensions, views, annotations, revision status and final deliverable.

TECHNICAL CHALLENGES AND RESOLUTIONS

club med table1

BIM EXECUTION AND COORDINATION PROCESS

3d View (2)

Model Setup

Reviewed project information, levels, grids, linked references and modelling standards.

Mechanical Modelling

Developed mechanical systems with coordinated routing, sizes, fittings and equipment interfaces.

Fabrication Detailing

Refined model geometry and connections to reflect fabrication and installation requirements.

Model Coordination

Federated relevant models in Navisworks and reviewed clashes, clearances and routing constraints.

Issue Resolution

Updated routes, elevations, offsets and component locations to address identified coordination issues.

Drawing Production

Prepared as-shop/fabrication drawings using the coordinated Revit model.

Final QA/QC

Checked model-to-drawing alignment, dimensions, annotations, views, revisions and deliverable completeness.

FINAL DELIVERABLES

Floor plan

The project scope resulted in the following deliverable categories:

  • Detailed mechanical fabrication BIM model.
  • Coordinated mechanical model reviewed for clashes and spatial constraints.
  • As-shop/fabrication drawings containing relevant dimensions and fabrication information.
  • Quality-checked documentation aligned with the latest coordinated model and project revision status.

PROJECT OUTCOME

Floor plan - 05

The Club Med project established an end-to-end mechanical BIM-to-fabrication workflow, integrating detailed modelling, coordination review, issue resolution, drawing production and quality control.

The coordinated model provided the basis for the final fabrication drawings, while the Navisworks review process supported the identification and resolution of coordination concerns before documentation issue.

The completed workflow supported improved visibility of mechanical routing, consistency between the model and drawings, and a structured approach to fabrication documentation.

KEY PROJECT HIGHLIGHTS

Integrated BIM Workflow

Connected mechanical modelling, coordination and drawing production.

Coordination-Focused Modelling

Reviewed routing, clearances and spatial constraints before final documentation.

Model-Based Documentation

Used the coordinated Revit model as the primary reference for fabrication drawings.

Structured Quality Control

Checked dimensions, annotations, revisions and drawing completeness before issue.

Fabrication-Oriented Delivery

Prepared coordinated model and drawing deliverable to support fabrication and installation planning.

Have a Complex Mechanical Project?

Let’s Engineer It Together with BIMBOSS CONSULTANTS.

From Model to Construction-Ready Documentation — BIMBOSS CONSULTANTS Connects the Workflow.

Explore Our Services

Explore More Case Studies



→ PUC COORDINATION & BIM ISSUE RESOLUTION



→ FROM MODEL TO SHOP DRAWING: NASHVILLE PROJECT



→ FSHU PROJECT CASE STUDY

Share it on Social Media